Pool Shell & Filtration Refurbishment!
We initially carried out an in-depth survey to the pool shell & filtration system to Kidsgrove Leisure Centre which highlighted a full refurbishment was necessary. We were delighted to be appointed to carry out these works alongside main contractor Willmott Dixon. The centre originally had a small learner pool along with a 25m pool with variable depth. The scope of works for the 25m pool shell was to extract all pool finishes and fill in the deep end pool to create a constant depth pool. The Learner pool was to be filled in and a gym to be built on top of the old shell. The plantroom required a brand new filtration system and chemical dosing rooms.
Pool shell works
- Extraction of old tiles, screed and render to pool shell
- Infill the deep end of pool to maintain a constant depth
- Infill of leaner pool
- Render to pool walls
- Screed to pool base
- Epoxy resin to pool base, walls, channel
- Installation of finger grip tile
- Installation of new HDPE transfer channel grating
- Installation of stainless-steel steps
- Installation of pool grills
- Installation of pool pod disabled hoist
- Installation of starter block and lane rope fixings
Filtration works
- Astral Sand filters
- Lowara main circulation pumps
- Aquatherm strainer boxes
- Cipriani heat exchanger
- Lowara booster pumps
- ATG UV system
- Benson electrical control panel
- Kuntze chemical controller
- Seko dosing pumps
- Flyght flow metre